Optimized acceleration of repetitive construction projects
I. Bakry, O. Moselhi
Full text PDF ( Download count: 1031)
Keywords: management & social issues; repetitive projects; acceleration; linear scheduling
I. Bakry, O. Moselhi (2012). Optimized acceleration of repetitive construction projects. Gerontechnology, 11(2), 397-397
https://doi.org/10.4017/gt.2012.11.02.090.00