Introducing and applying a modified AHP (Analysis Hierarchy Process) to analyse productivity at the construction site
S.S. Lee, G.Y. Lee, M.N. Lee, S.W. Kwon, J.H. Shin
Full text PDF ( Download count: 1123)
Keywords: productivity; work-sampling; AHP (Analysis Hierarchy Process); construction tool
S.S. Lee, G.Y. Lee, M.N. Lee, S.W. Kwon, J.H. Shin (2012). Introducing and applying a modified AHP (Analysis Hierarchy Process) to analyse productivity at the construction site. Gerontechnology, 11(2), 415-415
https://doi.org/10.4017/gt.2012.11.02.445.00